欧美丰满一区二区免费视频-欧美疯狂xxxx乱大交-欧美疯狂爱爱xxxxbbbb-欧美疯狂黑人xxxxbbbb-欧美疯狂性受xxxxx喷水-欧美疯狂做受xxxxx高潮

AC source power & DC source power manufacturing factory

Calculating method of alarm current

As we all know, the capacity selection of AC power supply equipment is very important.choosing the right AC power supply is very important for production, manufacturing, testing and R&D!

excessive capacity selection will increase unnecessary property investment; too small capacity selection will affect the normal production, testing and R&D process and even lead to unusable.

therefore, mastering and understanding the calculation of alarm current will clearly know how to choose the capacity of AC power supply equipment. Suitable power supply equipment will make people feel like a tiger!

AC power supply is divided into single-phase power supply and three-phase power supply according to the different output power.therefore, the calculation method of alarm current can also be divided into two kinds: single-phase power supply and three-phase power supply.
the following are introduced separately:

One:Single-phase power supply
Output 0-300V: divided into low and high gear.the alarm current of low-voltage gear is 120 V, and that of high-voltage gear is 240V. capacity (VA)/gear voltage (V)=gear alarm current (A).

Take 5KVA power supply as an example: 5000VA (capacity)/120V (low grade)≈42A; 5000VA/240V (high grade)≈21A.so we get the alarm current: the output of 5KVA power supply is in the range of 0 -150V, the maximum alarm (limit) current is 42A; the output of 5KVA power supply is in the range of 0 -300V, and the maximum alarm (limit) current is 21A.

Output 0-600V, low-grade 240V, high-grade 480V, the same method to get the alarm current of 21/10.5A.
The simple method is that we only need to calculate the low-grade or high-grade alarm current. Another kind of alarm current can be obtained immediately according to the low-grade alarm current = 2 times the high-grade alarm current

Two: Three-phase power supply
The alarm current is a single-phase alarm current, so the three-phase power supply needs capacity/3 to get the single-phase capacity, and then according to the calculation method of the alarm current of the single-phase power supply, the alarm current of the three-phase power supply can be obtained.

Take three-phase 15KVA power supply as an example: 15KVA/3 = 5KVA, 5000VA/120V≈42A (low-grade alarm current), 42A/2 ≈21A (high-grade alarm current).therefore, the alarm current of three-phase 15KVA power supply is 42/21A.

It is not difficult to find that the calculation of alarm current focuses on the unit of capacity is VA, the unit of voltage is V, and the unit of alarm current is A. Therefore, if the known unit of capacity is KVA, the unit of KVA should be converted to VA when calculating the alarm current. 1KVA is 1000VA.
Recommend Products
Online service
Service Hotline
86-769-89616802
86-13602353727

ADMIRE POWER
主站蜘蛛池模板: 日本www免费| 免看一级a毛片一片成人不卡| 久久e热| 在线观看视频在线观看| 草草影院www色极品欧美| 精品伊人久久大线蕉色首页| 色天使色婷婷丁香久久综合| 午夜网站在线| 中文一区在线| 男人透女人超爽视频免费| 揉女胸视频www网站免费观看| 亚洲成在人天堂一区二区| 全黄性色大片| 天天看片中文字幕| 伊人玖玖| 免费的国语一级淫片| 日韩亚洲制服丝袜中文字幕| 午夜免费看视频| yy4080午夜理论一级毛片| 欧美一级高清片| 天天爱综合| 91md天美精东蜜桃传媒在线| 欧美丝袜一区二区| 天天综合视频网| 91av免费| 色西西| 影音先锋国产资源| 欧美高清成人| 午夜操| 狠狠欧美| 色黄网站成年女人色毛片| 夜夜天天干| 美女扒开内裤让男人桶| 色偷偷资源网| 国产黄色高清视频| 日韩欧美一区二区三区中文精品| 亚洲欧洲一区二区三区在线观看| 国内精品久久久久影院免费| 色欧美亚洲| 国内一级特黄女人精品毛片| 五月天丁香婷婷开心激情五月|